Where the register points next
training.gov.au points at nothing after CPC30920: it is the current product, and no replacement is listed.
What the register says changed
These are the mapping notes training.gov.au attaches to each supersession, quoted as the register writes them. They are the only public record of what actually changed between two versions.
Is CPC30920 on your scope?
This page is the register's record of one product. What it cannot tell you is whether CPC30920 sits on your own scope today, or what else on that scope has moved without anyone noticing. Enter your RTO number and we read every product on your live scope against training.gov.au and tell you which ones are superseded and which replacements the register flags not equivalent.
Whether a supersession requires anything of you, and what, sits with you and your regulator. This page maps what the register records; it does not make that judgement. If the difference between an equivalent and a non-equivalent replacement is the question, we wrote it up in equivalent vs not equivalent.
What CPC30920 is made of
training.gov.au lists 24 units for CPC30920: 10 core and 14 elective. To complete it, the register publishes a rule of 10 core units plus 4 electives — 14 units in all.
Core units 10 listed
| Code | Unit | In this product |
|---|---|---|
| CPCCCM2006 | Apply basic levelling procedures | ●current |
| CPCCLSF2001 | Licence to erect, alter and dismantle scaffolding basic level | ●current |
| CPCCLSF3001 | Licence to erect, alter and dismantle scaffolding intermediate level | ●current |
| CPCCOM1012 | Work effectively and sustainably in the construction industry | ●current |
| CPCCOM1013 | Plan and organise work | ●current |
| CPCCOM1014 | Conduct workplace communication | ●current |
| CPCCOM1015 | Carry out measurements and calculations | ●current |
| CPCCOM2001 | Read and interpret plans and specifications | ●current |
| CPCCSC2001 | Handle and position scaffolding tools, equipment and components | ●current |
| CPCCWHS2001 | Apply WHS requirements, policies and procedures in the construction industry | ●current |
Elective units 14 listed
| Code | Unit | In this product |
|---|---|---|
| BSBESB301 | Investigate business opportunities | ●current |
| BSBESB407 | Manage finances for new business ventures | ●current |
| CPCCCM2007 | Use explosive power tools | ●current |
| CPCCCM2012 | Work safely at heights | ●current |
| CPCCCM3001 | Operate elevated work platforms up to 11 metres | ●current |
| CPCCCM3002 | Operate a truck-mounted loading crane | ●current |
| CPCCLDG3001 | Licence to perform dogging | ●current |
| CPCCLSF4001 | Licence to erect, alter and dismantle scaffolding advanced level | ●current |
| CPCCRI3001 | Operate personnel and materials hoists | ●current |
| CPCCSC2002 | Erect and dismantle basic scaffolding | ●current |
| CPCCSC3001 | Erect and dismantle intermediate scaffolding | ●current |
| CPCCSF2003 | Cut and bend materials using oxy-LPG equipment | ●current |
| RIIWHS302E | Implement traffic management plans | ●current |
| TLILIC0003 | Licence to operate a forklift truck | ●current |
Core and elective are the register's own flags on the unit grid of the release read here. "Not current" means training.gov.au no longer recommends that unit for use inside this product — it does not say anything about the product itself.
Source: this product on training.gov.au, Australia's national training register — or go straight to the units it requires. The rule itself is item 14 of F2025L00355, and ASQA publishes the extensions it has granted. Read on 28 August 2026 UTC. Every code, title, date, status and equivalence flag on this page is the register's; nothing here is estimated or inferred, and where the register publishes nothing we say so.
Every CPC training product on the register · Search all training products
Deliver this? We read the register nightly — get the free breakdown of your whole scope, and hear the day CPC30920 or anything else on it is superseded.
No account, no card. We never ask for anything about your learners. Your address gets this one report — no list, no marketing — and the scope watch only if you tick the box, with one click to stop it.