Where the register points next
training.gov.au points at nothing after UEE40820: it is the current product, and no replacement is listed.
What the register says changed
These are the mapping notes training.gov.au attaches to each supersession, quoted as the register writes them. They are the only public record of what actually changed between two versions.
Is UEE40820 on your scope?
This page is the register's record of one product. What it cannot tell you is whether UEE40820 sits on your own scope today, or what else on that scope has moved without anyone noticing. Enter your RTO number and we read every product on your live scope against training.gov.au and tell you which ones are superseded and which replacements the register flags not equivalent.
Whether a supersession requires anything of you, and what, sits with you and your regulator. This page maps what the register records; it does not make that judgement. If the difference between an equivalent and a non-equivalent replacement is the question, we wrote it up in equivalent vs not equivalent.
What UEE40820 is made of
training.gov.au lists 43 units for UEE40820: 9 core and 34 elective. The register does not publish a completion rule in units for this product, so we do not state one. How many of the electives are required is in the packaging rules on training.gov.au.
Core units 9 listed
| Code | Unit | In this product |
|---|---|---|
| UEECD0010 | Compile and produce an energy sector detailed report | ●current |
| UEECD0024 | Implement and monitor energy sector WHS policies and procedures | ●current |
| UEECD0027 | Participate in development and follow a personal competency development plan | ●current |
| UEEEC0008 | Commission large fire protection systems | ●current |
| UEEEC0026 | Enter and verify programs for fire protection systems | ●current |
| UEEEC0041 | Install fire detection and warning system apparatus | ●current |
| UEEEC0071 | Troubleshoot fire protection systems | ●current |
| UEEEC0076 | Verify compliance and functionality of fire protection system installations | ●current |
| UEERE0015 | Implement and monitor energy sector environmental and sustainable policies and procedures | ●current |
Elective units 34 listed
| Code | Unit | In this product |
|---|---|---|
| BSBOPS203 | Deliver a service to customers | ●current |
| CPCWHS1001 | Prepare to work safely in the construction industry | ●current |
| CPPFES2043 | Apply regulations to prevent ozone depleting substance and synthetic greenhouse gas emissions | ●current |
| HLTAID009 | Provide cardiopulmonary resuscitation | ●current |
| ICTICT214 | Operate application software packages | ●current |
| UEECD0011 | Comply with scheduled and preventative maintenance program processes | ●current |
| UEECD0035 | Provide basic instruction in the use of electrotechnology apparatus | ●current |
| UEECO0002 | Maintain documentation | ●current |
| UEECO0015 | Provide quotations for installation or service jobs | ●current |
| UEECO0017 | Source and purchase material/parts for installation or service jobs | ●current |
| UEECS0033 | Use engineering applications software on personal computers | ●current |
| UEEDV0005 | Install and maintain cabling for multiple access to telecommunication services | ●current |
| UEEDV0006 | Install and modify optical fibre performance data communication cabling | ●current |
| UEEDV0008 | Install, modify and verify coaxial and structured communication copper cabling | ●current |
| UEEEC0028 | Fault find and repair complex power supplies | ●current |
| UEEEC0060 | Repairs basic electronic apparatus faults by replacement of components | ●current |
| UEEEC0075 | Troubleshoot single phase input d.c power supplies | ●current |
| UEEEL0007 | Develop detailed electrical drawings | ●current |
| UEEEL0029 | Conduct compliance inspection of LV electrical installations with demand exceeding 100 A per phase | ●current |
| UEEEL0030 | Conduct compliance inspection of single phase LV electrical installations | ●current |
| UEEEL0031 | Conduct compliance inspection of special LV electrical installations | ●current |
| UEEEL0040 | Develop compliance policies and plans to conduct an electrical contracting business | ●current |
| UEEEL0049 | Install and maintain emergency safety systems | ●current |
| UEEEL0051 | Investigate and report on electrical incidents and causes | ●current |
| UEEEL0073 | Verify compliance and functionality of special LV electrical installations | ●current |
| UEEHA0004 | Enter a classified hazardous area to undertake work related to electrical equipment | ●current |
| UEEHA0022 | Determine the explosion-protection requirements to meet a specified classified hazardous area | ●current |
| UEEHA0025 | Install explosion-protected equipment and associated apparatus and wiring systems | ●current |
| UEEHA0026 | Maintain equipment associated with hazardous areas | ●current |
| UEEHA0038 | Conduct visual and close inspection of electrical installations for hazardous areas | ●current |
Show the remaining 4 elective units
| Code | Unit | In this product |
|---|---|---|
| UEEIC0002 | Assemble, enter and verify operating instructions in microprocessor equipped devices | ●current |
| UEEIC0013 | Develop, enter and verify discrete control programs for programmable controllers | ●current |
| UEEIC0014 | Develop, enter and verify programs in supervisory control and data acquisition systems | ●current |
| UEEIC0015 | Develop, enter and verify word and analogue control programs for programmable logic controllers | ●current |
Core and elective are the register's own flags on the unit grid of the release read here. "Not current" means training.gov.au no longer recommends that unit for use inside this product — it does not say anything about the product itself.
Source: this product on training.gov.au, Australia's national training register — or go straight to the units it requires. The rule itself is item 14 of F2025L00355, and ASQA publishes the extensions it has granted. Read on 28 August 2026 UTC. Every code, title, date, status and equivalence flag on this page is the register's; nothing here is estimated or inferred, and where the register publishes nothing we say so.
Every UEE training product on the register · Search all training products
Deliver this? We read the register nightly — get the free breakdown of your whole scope, and hear the day UEE40820 or anything else on it is superseded.
No account, no card. We never ask for anything about your learners. Your address gets this one report — no list, no marketing — and the scope watch only if you tick the box, with one click to stop it.