UEENEEG071C Install and set up interval metering

Supersededtraining.gov.au: supersededEquivalent

The currency period for UEENEEG071C ended on 29 July 2011 — 15 years ago. It names one replacement below, with the equivalence it declares for each.

Transition clockClosed to new enrolments

New enrolments are not permitted from 29 July 2012 — one year from the date the replacement was included on the National Register (s 14(1)(a)(i) of the National VET Regulator (Compliance Standards for NVR RTOs and Fit and Proper Person Requirements) Instrument 2025 (F2025L00355, in force 1 July 2025)), or from a later date if ASQA has approved otherwise for your organisation.

Learners already enrolled have no fixed deadline: they complete the product and are issued their AQF certification, or transfer to the replacement, in a timely manner (ASQA guidance, read live 25 August 2026).

The same date closes a second obligation: under s 7(2)(c) of the same instrument, advertising may refer to a superseded product only while it is on scope and new enrolments are permitted. When enrolments stop, the course page advertising it stops being permitted too — and if ASQA approves a later enrolment date, that moves with it.

Sector-wide: the item 14 cut-off, measured across every live scope · the repealed 12-month rule

Product type
Unit of competency
Training package
UEE07 — Electrotechnology Training Package
Currency period ends
29 July 2011
Latest release
Release 1 · 29 July 2011
Supersedes
UEENEEG071B
Superseded by
UEENEEG171A equivalent

Where the register points next

Each step below is one supersession training.gov.au publishes between two products. The label on the rail is the equivalence the register declares for that step — not our reading of it.

  1. UEENEEG071CSuperseded — equivalentInstall and set up interval metering
  2. equivalent
  3. UEENEEG171ASuperseded — equivalentInstall, set up and commission interval metering
  4. equivalent
  5. UEEEL0013Superseded — not equivalentInstall, set up and commission interval metering
  6. not equivalent
  7. UEEEL0078CurrentInstall and commission whole current electricity meters

What the register says changed

These are the mapping notes training.gov.au attaches to each supersession, quoted as the register writes them. They are the only public record of what actually changed between two versions.

  • UEENEEG071BUEENEEG071Cequivalent28 July 2011

    The register records this supersession but attaches no note on what changed.

  • UEENEEG071CUEENEEG171Aequivalent30 July 2011

    The register records this supersession but attaches no note on what changed.

Is UEENEEG071C on your scope?

This page is the register's record of one product. What it cannot tell you is whether UEENEEG071C sits on your own scope today, or what else on that scope has moved without anyone noticing. Enter your RTO number and we read every product on your live scope against training.gov.au and tell you which ones are superseded and which replacements the register flags not equivalent.

Public code, nothing else. We read your live scope from training.gov.au and answer here — nothing is stored unless you ask us to watch it.

Whether a supersession requires anything of you, and what, sits with you and your regulator. This page maps what the register records; it does not make that judgement. If the difference between an equivalent and a non-equivalent replacement is the question, we wrote it up in equivalent vs not equivalent.

Where UEENEEG071C is used

training.gov.au lists UEENEEG071C inside 4 training products, none of them current. Every one of them is below, with the register's own core or elective flag for UEENEEG071C in that product.

Products no longer current 4 listed

The register still records UEENEEG071C inside these, but it no longer recommends them as current. They are here because a scope history or an old enrolment can still point at them.

CodeTraining productTypeUEENEEG071C is
UEE42010Certificate IV in Electrical - Photovoltaic SystemsQualificationelective
UEESS00016Skill Set - Designer/Installer of Grid Connected Photovoltaic SystemsSkill setelective
UEESS00033Skill Set - Install and Set Up Interval MeteringSkill setelective
UEESS00036Skill Set - Installer of Grid Connected Photovoltaic SystemsSkill setelective

Source: this product on training.gov.au, Australia's national training register — or go straight to the units it requires. The rule itself is item 14 of F2025L00355, and ASQA publishes the extensions it has granted. Read on 28 August 2026 UTC. Every code, title, date, status and equivalence flag on this page is the register's; nothing here is estimated or inferred, and where the register publishes nothing we say so.

Every UEE training product on the register · Search all training products

Is UEENEEG071C still on your scope? Type your RTO code and get the free breakdown — every superseded product on your live scope, and whether the register flags each replacement equivalent.

No account, no card. We never ask for anything about your learners. Your address gets this one report — no list, no marketing — and the scope watch only if you tick the box, with one click to stop it.