Where the register points next
training.gov.au points at nothing after ICT60220: it is the current product, and no replacement is listed.
This product is listed on the National Schedule of Training Product Development: under review by Future Skills Organisation (Information and Communication Technology - (ICT) training package), expected submission to the Assurance Body 19 May 2028. That is a submission date, not a supersession date: assurance, endorsement and publication follow, so a new version can only reach the register after it.
Source: National Schedule of Training Product Development, training.gov.au (© Commonwealth of Australia), licensed under Creative Commons Attribution 4.0. Excludes the Commonwealth Coat of Arms, trademarks and third-party material. View the Schedule. Schedule read on 25 August 2026 UTC.
What the register says changed
These are the mapping notes training.gov.au attaches to each supersession, quoted as the register writes them. They are the only public record of what actually changed between two versions.
ICT60120ICT60220≠not equivalent18 January 2021
The register records this supersession but attaches no note on what changed.
ICT60615ICT60220≠not equivalent18 January 2021
The register records this supersession but attaches no note on what changed.
ICT80315ICT60220≠not equivalent18 January 2021
The register records this supersession but attaches no note on what changed.
ICT80415ICT60220≠not equivalent18 January 2021
The register records this supersession but attaches no note on what changed.
ICT80515ICT60220≠not equivalent18 January 2021
The register records this supersession but attaches no note on what changed.
ICT80615ICT60220≠not equivalent18 January 2021
The register records this supersession but attaches no note on what changed.
Is ICT60220 on your scope?
This page is the register's record of one product. What it cannot tell you is whether ICT60220 sits on your own scope today, or what else on that scope has moved without anyone noticing. Enter your RTO number and we read every product on your live scope against training.gov.au and tell you which ones are superseded and which replacements the register flags not equivalent.
Whether a supersession requires anything of you, and what, sits with you and your regulator. This page maps what the register records; it does not make that judgement. If the difference between an equivalent and a non-equivalent replacement is the question, we wrote it up in equivalent vs not equivalent.
What ICT60220 is made of
training.gov.au lists 151 units for ICT60220: 6 core and 145 elective. The register does not publish a completion rule in units for this product, so we do not state one. How many of the electives are required is in the packaging rules on training.gov.au.
Core units 6 listed
| Code | Unit | In this product |
|---|---|---|
| BSBCRT611 | Apply critical thinking for complex problem solving | ●current |
| BSBTWK502 | Manage team effectiveness | ●current |
| BSBXCS402 | Promote workplace cyber security awareness and best practices | ●current |
| ICTICT608 | Interact with clients on a business level | ●current |
| ICTICT618 | Manage IP, ethics and privacy in ICT environments | ●current |
| ICTSAD609 | Plan and monitor business analysis activities in an ICT environment | ●current |
Elective units 145 listed
| Code | Unit | In this product |
|---|---|---|
| BSBLDR523 | Lead and manage effective workplace relationships | ●current |
| BSBLDR601 | Lead and manage organisational change | ●current |
| BSBPMG430 | Undertake project work | ●current |
| BSBPMG530 | Manage project scope | ●current |
| BSBPMG532 | Manage project quality | ●current |
| BSBPMG536 | Manage project risk | ●current |
| BSBPMG537 | Manage project procurement | ●current |
| BSBPMG539 | Manage project governance | ●current |
| BSBSTR601 | Manage innovation and continuous improvement | ●current |
| CPPSEC3124 | Prepare and present evidence in court | ●current |
| CPPSEC5003 | Assess security risk management options | ●current |
| CPPSEC5004 | Develop security risk management plans | ●current |
| CPPSEC5005 | Implement security risk management plans | ●current |
| CPPSEC5006 | Develop strategies to implement advanced technology security systems | ●current |
| ICTCLD601 | Develop cloud computing strategies for businesses | ●current |
| ICTCLD602 | Manage information security compliance of cloud service deployment | ●current |
| ICTCLD603 | Design hybrid cloud-based network architectures | ●current |
| ICTCLD604 | Manage data in cloud environments | ●current |
| ICTCYS601 | Create cyber security standards for organisations | ●current |
| ICTCYS602 | Implement cyber security operations | ●current |
| ICTCYS603 | Undertake penetration testing for organisations | ●current |
| ICTCYS604 | Implement best practices for identity management | ●current |
| ICTCYS606 | Evaluate an organisation's compliance with cyber security standards and law | ●current |
| ICTCYS607 | Acquire digital forensic data | ●current |
| ICTCYS608 | Perform cyber security risk assessments | ●current |
| ICTCYS609 | Evaluate threats and vulnerabilities of IoT devices | ●current |
| ICTCYS611 | Configure security devices for organisations | ●current |
| ICTCYS612 | Design and implement virtualised cyber security infrastructure for organisations | ●current |
| ICTCYS614 | Analyse cyber security insider risks and threats and devise recommendations | ●current |
| ICTCYS615 | Detect and respond to cyber security insider risks and threats | ●current |
Show the remaining 115 elective units
| Code | Unit | In this product |
|---|---|---|
| ICTDAT601 | Develop data integration strategies | ●current |
| ICTDAT602 | Review data lifecycles | ●current |
| ICTDAT603 | Assess advanced data processes | ●current |
| ICTDBS505 | Monitor and improve knowledge management systems | ●current |
| ICTDBS604 | Build data warehouses | ●current |
| ICTDBS605 | Develop knowledge management strategies | ●current |
| ICTDBS606 | Determine database functionality and scalability | ●current |
| ICTICT522 | Evaluate vendor products and equipment | ●current |
| ICTICT523 | Gather data to identify business requirements | ●current |
| ICTICT529 | Organise and lead agile projects | ●current |
| ICTICT530 | Design user experience solutions | ●current |
| ICTICT611 | Develop ICT strategic business plans | ●current |
| ICTICT612 | Develop contracts and manage contract performance | ●current |
| ICTICT613 | Manage the use of development methodologies | ●current |
| ICTICT614 | Identify and implement business innovation | ●current |
| ICTICT615 | Implement knowledge management strategies | ●current |
| ICTICT616 | Develop communities of practice | ●current |
| ICTICT617 | Lead the evaluation and implementation of current industry specific technologies | ●current |
| ICTICT818 | Develop knowledge management strategies | ●current |
| ICTICT819 | Lead analysis of information and communications technology business strategy | ●current |
| ICTICT822 | Manage automated ICT system applications | ●current |
| ICTNPL412 | Apply business acumen to network planning | ●current |
| ICTNPL413 | Evaluate networking regulations and legislation for the telecommunications industry | ●current |
| ICTNWK537 | Implement secure encryption technologies | ●current |
| ICTNWK538 | Install and maintain valid authentication processes | ●current |
| ICTNWK539 | Design and implement integrated server solutions | ●current |
| ICTNWK540 | Design, build and test network servers | ●current |
| ICTNWK541 | Configure, verify and troubleshoot WAN links and IP services | ●current |
| ICTNWK544 | Design and implement a security perimeter for ICT networks | ●current |
| ICTNWK546 | Manage network security | ●current |
| ICTNWK549 | Design ICT security frameworks | ●current |
| ICTNWK552 | Install and configure network access storage devices | ●current |
| ICTNWK553 | Configure enterprise virtual computing environments | ●current |
| ICTNWK554 | Manage enterprise virtual computing environments | ●current |
| ICTNWK556 | Identify and resolve network problems | ●current |
| ICTNWK557 | Configure and manage advanced virtual computing environments | ●current |
| ICTNWK558 | Monitor and troubleshoot virtual computing environments | ●current |
| ICTNWK559 | Install an enterprise virtual computing environment | ●current |
| ICTNWK560 | Determine best-fit topologies for wide area networks | ●current |
| ICTNWK561 | Design enterprise wireless local area networks | ●current |
| ICTNWK612 | Plan and manage troubleshooting advanced integrated IP networks | ●current |
| ICTNWK615 | Design and configure desktop virtualisation | ●current |
| ICTNWK618 | Design and implement a security system | ●current |
| ICTNWK619 | Plan, configure and test advanced server-based security | ●current |
| ICTNWK620 | Design and implement wireless network security | ●current |
| ICTNWK621 | Configure network devices for a secure network infrastructure | ●current |
| ICTNWK622 | Configure and manage intrusion prevention system on network sensors | ●current |
| ICTNWK624 | Configure advanced internetwork routing solutions | ●current |
| ICTNWK625 | Plan and configure advanced internetwork switching solutions | ●current |
| ICTNWK627 | Implement voice applications over secure wireless networks | ●current |
| ICTNWK628 | Design and build integrated VoIP networks | ●current |
| ICTNWK629 | Configure and manage storage area networks | ●current |
| ICTOPN605 | Manage optical ethernet transmission | ●current |
| ICTOPN606 | Manage dense wavelength division multiplexing transmission systems | ●current |
| ICTOPN607 | Design dense wavelength division multiplexing systems | ●current |
| ICTOPN608 | Analyse optical transmission systems | ●current |
| ICTPMG506 | Prepare network project briefs | ●current |
| ICTPMG612 | Manage ICT project initiation | ●current |
| ICTPMG613 | Manage ICT project planning | ●current |
| ICTPMG614 | Manage ICT project delivery | ●current |
| ICTPMG615 | Manage ICT project closure | ●current |
| ICTPMG616 | Manage ICT project systems implementation | ●current |
| ICTPMG617 | Plan and direct complex ICT projects | ●current |
| ICTPRG535 | Build advanced user interfaces | ●current |
| ICTPRG537 | Implement security for applications | ●current |
| ICTPRG547 | Apply advanced programming skills in another language | ●current |
| ICTPRG549 | Apply intermediate object-oriented language skills | ●current |
| ICTPRG553 | Create and develop REST APIs | ●current |
| ICTPRG554 | Manage data persistence using noSQL data stores | ●current |
| ICTPRG603 | Develop advanced mobile multi-touch applications | ●current |
| ICTPRG605 | Manage development of technical solutions from business specifications | ●current |
| ICTPRG614 | Create cloud computing services | ●current |
| ICTRFN804 | Produce radio link budgets | ●current |
| ICTRFN805 | Analyse cellular mobile network systems | ●current |
| ICTRFN806 | Analyse satellite communications systems | ●current |
| ICTSAD507 | Design and implement quality assurance processes for business solutions | ●current |
| ICTSAD508 | Develop technical requirements for business solutions | ●current |
| ICTSAD604 | Manage and communicate ICT solutions | ●current |
| ICTSAD608 | Perform ICT-focused enterprise analysis | ●current |
| ICTSAD610 | Analyse stakeholder requirements | ●current |
| ICTSAD611 | Manage assessment and validation of ICT solutions | ●current |
| ICTSAD612 | Implement and maintain uses of containerisation | ●current |
| ICTSAD613 | Install and configure container orchestration services | ●current |
| ICTSAD614 | Lead ICT requirements elicitation | ●current |
| ICTSAS522 | Manage the testing process | ●current |
| ICTSAS530 | Use network tools | ●current |
| ICTSAS602 | Implement change management processes | ●current |
| ICTSUS603 | Integrate sustainability in ICT planning and design projects | ●current |
| ICTSUS604 | Prepare business cases for sustainability and competitive advantage in ICT projects | ●current |
| ICTSUS811 | Conduct and manage life cycle assessments for sustainability | ●current |
| ICTSUS812 | Lead applied research in ICT sustainability | ●current |
| ICTTEN613 | Assess integration of international network equipment into Australian networks | ●current |
| ICTTEN614 | Conduct network system optimisation and administration | ●current |
| ICTTEN615 | Manage network traffic | ●current |
| ICTTEN616 | Rectify client services following network outages and faults | ●current |
| ICTTEN617 | Manage common channel signalling networks | ●current |
| ICTTEN618 | Analyse and organise repair of highly complex networks | ●current |
| ICTTEN619 | Test new software and hardware releases | ●current |
| ICTTEN620 | Produce and evaluate architecture designs for convergent cellular mobile networks | ●current |
| ICTTEN621 | Design and configure IP-MPLS networks with virtual private network tunnelling | ●current |
| ICTTEN622 | Produce ICT network architecture designs | ●current |
| ICTTEN623 | Design and manage internet protocol TV in a service provider network | ●current |
| ICTTEN817 | Plan transmission networks | ●current |
| ICTTEN818 | Align systems with product and technology strategy | ●current |
| ICTTEN819 | Translate domain and solution architectures into platform requirements and designs | ●current |
| ICTTEN820 | Manage end to end architectural solutions across multiple domains | ●current |
| ICTTEN821 | Manage solution architecture and impacts | ●current |
| ICTTEN822 | Manage application layer solutions | ●current |
| ICTTEN823 | Manage voice, data and internet protocol network solutions | ●current |
| ICTTEN824 | Manage network testing strategies | ●current |
| ICTTEN825 | Investigate applications of cloud networks in network switching | ●current |
| ICTTEN826 | Evaluate and apply digital signal processing to communication systems | ●current |
| ICTTEN827 | Produce engineering solutions | ●current |
| ICTTEN828 | Manage development and application of testing artefacts | ●current |
| PSPPCM023 | Manage strategic contracts | ●current |
Core and elective are the register's own flags on the unit grid of the release read here. "Not current" means training.gov.au no longer recommends that unit for use inside this product — it does not say anything about the product itself.
Source: this product on training.gov.au, Australia's national training register — or go straight to the units it requires. The rule itself is item 14 of F2025L00355, and ASQA publishes the extensions it has granted. Read on 28 August 2026 UTC. Every code, title, date, status and equivalence flag on this page is the register's; nothing here is estimated or inferred, and where the register publishes nothing we say so.
Every ICT training product on the register · Search all training products
Deliver this? We read the register nightly — get the free breakdown of your whole scope, and hear the day ICT60220 or anything else on it is superseded.
No account, no card. We never ask for anything about your learners. Your address gets this one report — no list, no marketing — and the scope watch only if you tick the box, with one click to stop it.