UEP40218 Certificate IV in ESI Generation - Operations

Supersededtraining.gov.au: supersededNonEquivalent

The currency period for UEP40218 ended on 18 April 2022 — 4 years ago. It names one replacement below, with the equivalence it declares for each.

Transition clockClosed to new enrolments

New enrolments are not permitted from 20 April 2023 — one year from the date the replacement was included on the National Register (s 14(1)(a)(i) of the National VET Regulator (Compliance Standards for NVR RTOs and Fit and Proper Person Requirements) Instrument 2025 (F2025L00355, in force 1 July 2025)), or from a later date if ASQA has approved otherwise for your organisation.

Learners already enrolled have no fixed deadline: they complete the product and are issued their AQF certification, or transfer to the replacement, in a timely manner (ASQA guidance, read live 25 August 2026).

The same date closes a second obligation: under s 7(2)(c) of the same instrument, advertising may refer to a superseded product only while it is on scope and new enrolments are permitted. When enrolments stop, the course page advertising it stops being permitted too — and if ASQA approves a later enrolment date, that moves with it.

Sector-wide: the item 14 cut-off, measured across every live scope · the repealed 12-month rule

Product type
Qualification
Training package
UEP — Electricity Supply Industry - Generation Sector Training Package
Currency period ends
18 April 2022
Latest release
Release 2 · 21 April 2021 · 2 releases in all
Supersedes
UEP40212
Superseded by
UEP40122 not equivalent

Where the register points next

Each step below is one supersession training.gov.au publishes between two products. The label on the rail is the equivalence the register declares for that step — not our reading of it.

  1. UEP40218Superseded — not equivalentCertificate IV in ESI Generation - Operations
  2. not equivalent
  3. UEP40122CurrentCertificate IV in ESI Generation

What the register says changed

These are the mapping notes training.gov.au attaches to each supersession, quoted as the register writes them. They are the only public record of what actually changed between two versions.

  • UEP40212UEP40218equivalent30 October 2018

    The register records this supersession but attaches no note on what changed.

  • UEP40218UEP40122not equivalent19 April 2022

    The register records this supersession but attaches no note on what changed.

Is UEP40218 on your scope?

This page is the register's record of one product. What it cannot tell you is whether UEP40218 sits on your own scope today, or what else on that scope has moved without anyone noticing. Enter your RTO number and we read every product on your live scope against training.gov.au and tell you which ones are superseded and which replacements the register flags not equivalent.

Public code, nothing else. We read your live scope from training.gov.au and answer here — nothing is stored unless you ask us to watch it.

Whether a supersession requires anything of you, and what, sits with you and your regulator. This page maps what the register records; it does not make that judgement. If the difference between an equivalent and a non-equivalent replacement is the question, we wrote it up in equivalent vs not equivalent.

What UEP40218 is made of

training.gov.au lists 117 units for UEP40218: 18 core and 99 elective. The register does not publish a completion rule in units for this product, so we do not state one. How many of the electives are required is in the packaging rules on training.gov.au.

Core units 18 listed

CodeUnitIn this product
UEENEEE101AApply Occupational Health and Safety regulations, codes and practices in the workplacenot current
UEENEEE117AImplement and monitor energy sector OHS policies and proceduresnot current
UEPOPS202Apply quality systems to worknot current
UEPOPS252Undertake local systems operationsnot current
UEPOPS301Conduct single energy source isolation procedures for permit to worknot current
UEPOPS337Maintain quality systems within the teamnot current
UEPOPS342Analyse single protection device operationnot current
UEPOPS347Operate and monitor supervisory, control and data acquisition systemsnot current
UEPOPS369Respond to a critical incidentnot current
UEPOPS402Conduct multiple energy source isolation procedures for permit to worknot current
UEPOPS403Coordinate permit to work systemnot current
UEPOPS405Operate and monitor A.C. electrical systemsnot current
UEPOPS406Operate and monitor D.C. electrical systemsnot current
UEPOPS417Monitor and implement environmental site plans and proceduresnot current
UEPOPS426Interpret and analyse multi-operation protection devicesnot current
UEPOPS439Plan and organise worknot current
UEPOPS440Coordinate team activitiesnot current
UEPOPS454Coordinate response to critical incidentsnot current

Elective units 99 listed

CodeUnitIn this product
BSBCUS401Coordinate implementation of customer service strategiesnot current
BSBINM401Implement workplace information systemnot current
BSBINN301Promote innovation in a team environmentnot current
BSBLDR402Lead effective workplace relationshipsnot current
BSBLDR403Lead team effectivenessnot current
BSBLED401Develop teams and individualsnot current
BSBMGT402Implement operational plannot current
BSBMGT403Implement continuous improvementnot current
BSBWOR404Develop work prioritiesnot current
TAEDEL301Provide work skill instructionnot current
UEPOPL001Licence to operate a steam turbinenot current
UEPOPL002Licence to operate a reciprocating steam enginenot current
UEPOPS203Operate and monitor communications systemnot current
UEPOPS309Operate and monitor air conditioning plant and ventilation systemsnot current
UEPOPS310Operate bulk coal handling plantnot current
UEPOPS311Operate fabric filter dust collection plantnot current
UEPOPS312Operate and monitor fuel supplynot current
UEPOPS313Operate and monitor boiler draught systemnot current
UEPOPS314Operate and monitor fuel firing plant (gas or oil)not current
UEPOPS315Operate and monitor fuel firing plant (coal)not current
UEPOPS316Operate and monitor boiler steam/water cyclenot current
UEPOPS317Operate and monitor fixed fire protection systemsnot current
UEPOPS318Operate and monitor compressed gas systemsnot current
UEPOPS319Operate and monitor gas production plantnot current
UEPOPS320Operate and monitor compressed air systemsnot current
UEPOPS321Operate and monitor water treatment plantnot current
UEPOPS322Operate and monitor alkalinity reduction plantnot current
UEPOPS323Operate and monitor reverse osmosis plantnot current
UEPOPS324Operate and monitor brine concentrator plantnot current
UEPOPS325Operate and monitor water quality monitoring systemsnot current
Show the remaining 69 elective units
CodeUnitIn this product
UEPOPS326Operate and monitor oil systemsnot current
UEPOPS327Monitor and maintain civil assetsnot current
UEPOPS328Undertake dam safety surveillancenot current
UEPOPS329Operate and monitor auxiliary steam systemsnot current
UEPOPS330Operate and monitor heat exchangers and cooling systemsnot current
UEPOPS331Operate and monitor water systems (condensate and feedwater)not current
UEPOPS332Operate and monitor condenser and auxiliary cooling systemsnot current
UEPOPS333Operate and monitor HRSG hot gas control systemnot current
UEPOPS335Operate a hydro generator synchronous condenser pump unitnot current
UEPOPS336Manage, operate and monitor a gas turbine unitnot current
UEPOPS338Facilitate workplace communicationnot current
UEPOPS339Operate and monitor a boiler unitnot current
UEPOPS340Operate and monitor a steam turbinenot current
UEPOPS343Operate hydroelectric generating plant and auxiliary equipmentnot current
UEPOPS344Conduct water conveyance and controlnot current
UEPOPS345Implement dam safety surveillance proceduresnot current
UEPOPS346Conduct non-routine operational testingnot current
UEPOPS349Operate local H.V. switchgearnot current
UEPOPS351Operate H.V. condition changing apparatusnot current
UEPOPS352Conduct operational checks on in-service mechanical plantnot current
UEPOPS354Operate and monitor dual fuel firing plantnot current
UEPOPS355Monitor the implementation of under frequency load sheddingnot current
UEPOPS356Apply environmental and sustainable energy proceduresnot current
UEPOPS357Operate local L.V. switchgearnot current
UEPOPS358Monitor and maintain wind farm civil assetsnot current
UEPOPS359Monitor climatic conditions for renewable energy productionnot current
UEPOPS360Operate and monitor a hydro turbinenot current
UEPOPS361Operate and monitor hydro plant auxiliary systemsnot current
UEPOPS362Operate and monitor generator/alternatornot current
UEPOPS364Ensure compliance with Work, Health and Safety policy and proceduresnot current
UEPOPS368Operate manual systemsnot current
UEPOPS370Facilitate the use of contingency plans for power generation facilitiesnot current
UEPOPS371Carry out operational checks on in-service electrical plantnot current
UEPOPS404Coordinate first response team operationnot current
UEPOPS407Start and run up gas turbinenot current
UEPOPS408Shut down a gas turbinenot current
UEPOPS409Start up a boiler unitnot current
UEPOPS410Shut down a boiler unitnot current
UEPOPS411Run up a steam turbinenot current
UEPOPS412Undertake commissioning and decommissioningnot current
UEPOPS413Coordinate operational strategies for power productionnot current
UEPOPS414Perform risk analysis of generation plantnot current
UEPOPS416Monitor implementation of quality control for production and maintenancenot current
UEPOPS419Shut down a steam turbinenot current
UEPOPS420Coordinate network/systemnot current
UEPOPS422Schedule generationnot current
UEPOPS423Plan a scheduled outagenot current
UEPOPS424Coordinate local H.V. networksnot current
UEPOPS425Produce maintenance plans for generation production plantnot current
UEPOPS428Develop H.V. switching programsnot current
UEPOPS430Control permit to work operationsnot current
UEPOPS431Collect and analyse hydrological and meteorological datanot current
UEPOPS432Start up a heat recovery steam generator unitnot current
UEPOPS433Operate and monitor a heat recovery steam generator unitnot current
UEPOPS434Shut down a heat recovery steam generator unitnot current
UEPOPS435Operate and monitor flue gas (NOx) mitigation systemsnot current
UEPOPS437Manage system restartnot current
UEPOPS441Operate and monitor system equipmentnot current
UEPOPS442Monitor and coordinate the operation of a combined cycle gas turbine unitnot current
UEPOPS443Coordinate wind farm operationsnot current
UEPOPS444Start and run-up a hydro turbinenot current
UEPOPS445Shut down a hydro turbinenot current
UEPOPS446Operate and monitor hydro unit control and protection systemsnot current
UEPOPS447Coordinate photovoltaic solar power plant operationsnot current
UEPOPS450Coordinate workplace communicationnot current
UEPOPS451Coordinate the use of contingency plansnot current
UEPOPS452Conduct operational checks and carry out corrective action on in-service electrical plantnot current
UEPOPS456Perform switching to a switching programnot current
UEPOPS457Control electrical energy productionnot current

Core and elective are the register's own flags on the unit grid of the release read here. "Not current" means training.gov.au no longer recommends that unit for use inside this product — it does not say anything about the product itself.

Source: this product on training.gov.au, Australia's national training register — or go straight to the units it requires. The rule itself is item 14 of F2025L00355, and ASQA publishes the extensions it has granted. Read on 28 August 2026 UTC. Every code, title, date, status and equivalence flag on this page is the register's; nothing here is estimated or inferred, and where the register publishes nothing we say so.

Every UEP training product on the register · Search all training products

Is UEP40218 still on your scope? Type your RTO code and get the free breakdown — every superseded product on your live scope, and whether the register flags each replacement equivalent.

No account, no card. We never ask for anything about your learners. Your address gets this one report — no list, no marketing — and the scope watch only if you tick the box, with one click to stop it.