Where the register points next
training.gov.au points at nothing after UEP50122: it is the current product, and no replacement is listed.
This product is listed on the National Schedule of Training Product Development: under review by Powering Skills Organisation (UEP Full Training Product Review), expected submission to the Assurance Body 1 March 2028. That is a submission date, not a supersession date: assurance, endorsement and publication follow, so a new version can only reach the register after it.
Source: National Schedule of Training Product Development, training.gov.au (© Commonwealth of Australia), licensed under Creative Commons Attribution 4.0. Excludes the Commonwealth Coat of Arms, trademarks and third-party material. View the Schedule. Schedule read on 25 August 2026 UTC.
What the register says changed
These are the mapping notes training.gov.au attaches to each supersession, quoted as the register writes them. They are the only public record of what actually changed between two versions.
Is UEP50122 on your scope?
This page is the register's record of one product. What it cannot tell you is whether UEP50122 sits on your own scope today, or what else on that scope has moved without anyone noticing. Enter your RTO number and we read every product on your live scope against training.gov.au and tell you which ones are superseded and which replacements the register flags not equivalent.
Whether a supersession requires anything of you, and what, sits with you and your regulator. This page maps what the register records; it does not make that judgement. If the difference between an equivalent and a non-equivalent replacement is the question, we wrote it up in equivalent vs not equivalent.
What UEP50122 is made of
training.gov.au lists 138 units for UEP50122: 12 core and 126 elective. The register does not publish a completion rule in units for this product, so we do not state one. How many of the electives are required is in the packaging rules on training.gov.au.
Core units 12 listed
| Code | Unit | In this product |
|---|---|---|
| UEECD0007 | Apply work health and safety regulations, codes and practices in the workplace | ●current |
| UEECD0024 | Implement and monitor energy sector WHS policies and procedures | ●current |
| UEPOPS001 | Analyse single protection device operation | ●current |
| UEPOPS003 | Apply quality systems to work | ●current |
| UEPOPS031 | Coordinate response to critical incidents | ●current |
| UEPOPS032 | Coordinate team activities | ●current |
| UEPOPS043 | Interpret and analyse multi-operation protection devices | ●current |
| UEPOPS047 | Maintain quality systems within the team | ●current |
| UEPOPS053 | Manage operational crisis to maintain or restore power system integrity | ●current |
| UEPOPS058 | Manage work health and safety policy and procedures | ●current |
| UEPOPS061 | Monitor and implement environmental site plans and procedures | ●current |
| UEPOPS130 | Respond to a critical incident | ●current |
Elective units 126 listed
| Code | Unit | In this product |
|---|---|---|
| BSBHRM523 | Coordinate the learning and development of teams and individuals | ●current |
| BSBINS501 | Implement information and knowledge management systems | ●current |
| BSBLDR522 | Manage people performance | ●current |
| BSBOPS502 | Manage business operational plans | ●current |
| BSBOPS505 | Manage organisational customer service | ●current |
| BSBPEF501 | Manage personal and professional development | ●current |
| BSBSTR501 | Establish innovative work environments | ●current |
| BSBSTR502 | Facilitate continuous improvement | ●current |
| BSBTWK502 | Manage team effectiveness | ●current |
| BSBWHS521 | Ensure a safe workplace for a work area | ●current |
| UEECO0001 | Estimate electrotechnology projects | ●current |
| UEPOPL003 | Licence to operate a reciprocating steam engine | ●current |
| UEPOPL004 | Licence to operate a steam turbine | ●current |
| UEPOPS002 | Apply environmental and sustainable energy procedures | ●current |
| UEPOPS004 | Carry out operational checks on in-service electrical plant | ●current |
| UEPOPS006 | Collect and analyse hydrological and meteorological data | ●current |
| UEPOPS011 | Conduct multiple energy source isolation procedures for permit to work | ●current |
| UEPOPS012 | Conduct non-routine operational testing | ●current |
| UEPOPS013 | Conduct operational checks and carry out corrective action on in-service electrical plant | ●current |
| UEPOPS014 | Conduct operational checks on in-service mechanical plant | ●current |
| UEPOPS015 | Conduct project management | ●current |
| UEPOPS017 | Conduct single energy source isolation procedures for permit to work | ●current |
| UEPOPS018 | Conduct water conveyance and control | ●current |
| UEPOPS019 | Control electrical energy production | ●current |
| UEPOPS020 | Control hydro generation pumping | ●current |
| UEPOPS021 | Control permit to work operations | ●current |
| UEPOPS022 | Coordinate and direct switching program | ●current |
| UEPOPS023 | Coordinate electrical energy production | ●current |
| UEPOPS024 | Coordinate first response team operation | ●current |
| UEPOPS025 | Coordinate local H.V. networks | ●current |
Show the remaining 96 elective units
| Code | Unit | In this product |
|---|---|---|
| UEPOPS026 | Coordinate network/system | ●current |
| UEPOPS027 | Coordinate operational strategies for power production | ●current |
| UEPOPS028 | Coordinate permit to work system | ●current |
| UEPOPS029 | Coordinate photovoltaic solar power plant operations | ●current |
| UEPOPS030 | Coordinate power generation | ●current |
| UEPOPS033 | Coordinate the use of contingency plans | ●current |
| UEPOPS034 | Coordinate wind farm operations | ●current |
| UEPOPS035 | Coordinate workplace communication | ●current |
| UEPOPS036 | Develop H.V. switching programs | ●current |
| UEPOPS037 | Ensure compliance with work health and safety policy and procedures | ●current |
| UEPOPS038 | Evaluate cost estimations and initiate appropriate solutions | ●current |
| UEPOPS039 | Evaluate scheduling of generation plant | ●current |
| UEPOPS040 | Facilitate the use of contingency plans for power generation facilities | ●current |
| UEPOPS041 | Facilitate workplace communication | ●current |
| UEPOPS042 | Implement dam safety surveillance procedures | ●current |
| UEPOPS048 | Manage commissioning and decommissioning | ●current |
| UEPOPS049 | Manage critical incidents | ●current |
| UEPOPS050 | Manage environmental management systems | ●current |
| UEPOPS051 | Manage first response team | ●current |
| UEPOPS052 | Manage high voltage network system | ●current |
| UEPOPS054 | Manage operational strategies for power production | ●current |
| UEPOPS055 | Manage permit to work system | ●current |
| UEPOPS056 | Manage quality control procedures | ●current |
| UEPOPS057 | Manage system restart | ●current |
| UEPOPS059 | Manage, operate and monitor a gas turbine unit | ●current |
| UEPOPS060 | Monitor and coordinate the operation of a combined cycle gas turbine unit | ●current |
| UEPOPS062 | Monitor and maintain civil assets | ●current |
| UEPOPS063 | Monitor and maintain wind farm civil assets | ●current |
| UEPOPS064 | Monitor climatic conditions for renewable energy production | ●current |
| UEPOPS065 | Monitor implementation of quality control for production and maintenance | ●current |
| UEPOPS066 | Monitor power generation plant reliability | ●current |
| UEPOPS067 | Monitor the implementation of under frequency load shedding | ●current |
| UEPOPS068 | Operate a hydro generator synchronous condenser pump unit | ●current |
| UEPOPS070 | Operate and monitor a boiler unit | ●current |
| UEPOPS071 | Operate and monitor a heat recovery steam generator unit | ●current |
| UEPOPS072 | Operate and monitor a hydro turbine | ●current |
| UEPOPS073 | Operate and monitor a steam turbine | ●current |
| UEPOPS075 | Operate and monitor a.c. electrical systems | ●current |
| UEPOPS076 | Operate and monitor air conditioning plant and ventilation systems | ●current |
| UEPOPS077 | Operate and monitor alkalinity reduction plant | ●current |
| UEPOPS081 | Operate and monitor auxiliary steam systems | ●current |
| UEPOPS082 | Operate and monitor boiler draught system | ●current |
| UEPOPS083 | Operate and monitor boiler steam/water cycle | ●current |
| UEPOPS084 | Operate and monitor brine concentrator plant | ●current |
| UEPOPS086 | Operate and monitor compressed air systems | ●current |
| UEPOPS087 | Operate and monitor compressed gas systems | ●current |
| UEPOPS088 | Operate and monitor condenser and auxiliary cooling systems | ●current |
| UEPOPS089 | Operate and monitor d.c. electrical systems | ●current |
| UEPOPS090 | Operate and monitor dual fuel firing plant | ●current |
| UEPOPS092 | Operate and monitor fixed fire protection systems | ●current |
| UEPOPS093 | Operate and monitor flue gas (NOx) mitigation systems | ●current |
| UEPOPS094 | Operate and monitor fuel firing plant - coal | ●current |
| UEPOPS095 | Operate and monitor fuel firing plant - gas/oil | ●current |
| UEPOPS096 | Operate and monitor fuel supply | ●current |
| UEPOPS098 | Operate and monitor gas production plant | ●current |
| UEPOPS099 | Operate and monitor generator/alternator | ●current |
| UEPOPS100 | Operate and monitor heat exchangers and cooling systems | ●current |
| UEPOPS101 | Operate and monitor HRSG hot gas control system | ●current |
| UEPOPS102 | Operate and monitor hydro plant auxiliary systems | ●current |
| UEPOPS103 | Operate and monitor hydro unit control and protection systems | ●current |
| UEPOPS104 | Operate and monitor oil systems | ●current |
| UEPOPS105 | Operate and monitor reverse osmosis plant | ●current |
| UEPOPS107 | Operate and monitor supervisory control and data acquisition systems | ●current |
| UEPOPS108 | Operate and monitor system equipment | ●current |
| UEPOPS109 | Operate and monitor water quality monitoring systems | ●current |
| UEPOPS110 | Operate and monitor water systems condensate and feedwater | ●current |
| UEPOPS111 | Operate and monitor water treatment plant | ●current |
| UEPOPS112 | Operate bulk coal handling plant | ●current |
| UEPOPS113 | Operate fabric filter dust collection plant | ●current |
| UEPOPS114 | Operate H.V. condition changing apparatus | ●current |
| UEPOPS115 | Operate hydroelectric generating plant and auxiliary equipment | ●current |
| UEPOPS116 | Operate local H.V. switchgear | ●current |
| UEPOPS117 | Operate local L.V. switchgear | ●current |
| UEPOPS118 | Operate manual systems | ●current |
| UEPOPS120 | Undertake operational commissioning and decommissioning | ●current |
| UEPOPS122 | Perform process plant inspections | ●current |
| UEPOPS123 | Perform risk analysis of generation plant | ●current |
| UEPOPS124 | Perform switching to a switching program | ●current |
| UEPOPS126 | Plan a scheduled outage | ●current |
| UEPOPS127 | Plan and organise work | ●current |
| UEPOPS128 | Produce maintenance plans for generation production plant | ●current |
| UEPOPS129 | Produce maintenance strategies for generation production plant | ●current |
| UEPOPS131 | Run up a steam turbine | ●current |
| UEPOPS132 | Schedule generation | ●current |
| UEPOPS133 | Shut down a boiler unit | ●current |
| UEPOPS134 | Shut down a gas turbine | ●current |
| UEPOPS135 | Shut down a heat recovery steam generator unit | ●current |
| UEPOPS136 | Shut down a hydro turbine | ●current |
| UEPOPS137 | Shut down a steam turbine | ●current |
| UEPOPS138 | Start and run up gas turbine | ●current |
| UEPOPS139 | Start and run up a hydro turbine | ●current |
| UEPOPS140 | Start up a boiler unit | ●current |
| UEPOPS141 | Start up a heat recovery steam generator unit | ●current |
| UEPOPS143 | Tune process plant and equipment | ●current |
| UEPOPS144 | Undertake dam safety surveillance | ●current |
| UEPOPS145 | Undertake local systems operations | ●current |
Core and elective are the register's own flags on the unit grid of the release read here. "Not current" means training.gov.au no longer recommends that unit for use inside this product — it does not say anything about the product itself.
Source: this product on training.gov.au, Australia's national training register — or go straight to the units it requires. The rule itself is item 14 of F2025L00355, and ASQA publishes the extensions it has granted. Read on 28 August 2026 UTC. Every code, title, date, status and equivalence flag on this page is the register's; nothing here is estimated or inferred, and where the register publishes nothing we say so.
Every UEP training product on the register · Search all training products
Deliver this? We read the register nightly — get the free breakdown of your whole scope, and hear the day UEP50122 or anything else on it is superseded.
No account, no card. We never ask for anything about your learners. Your address gets this one report — no list, no marketing — and the scope watch only if you tick the box, with one click to stop it.