PSP61010 Advanced Diploma of Translating

Supersededtraining.gov.au: supersededEquivalent

The currency period for PSP61010 ended on 30 October 2012 — 13 years ago. It names one replacement below, with the equivalence it declares for each.

Transition clockOpen for new enrolmentsClosing to new enrolments soonClosed to new enrolments

For an RTO registered by ASQA, new enrolments are not permitted today, unless ASQA has approved otherwise — for your organisation, for a class of RTOs, or for all RTOs. The one-year point this rule counts from — one year from the date the replacement was included on the National Register — fell earlier, on 1 November 2013. That date is arithmetic, not a day on which this instrument prohibited anything: s 14(1)(a)(i) of the National Vocational Education and Training Regulator (Compliance Standards for NVR Registered Training Organisations and Fit and Proper Person Requirements) Instrument 2025 (F2025L00355) commenced on 1 July 2025 and imposes nothing before then. RTOs registered by VRQA in Victoria or by the TAC in Western Australia are not covered by it.

Learners already enrolled have no fixed deadline: they complete the product and are issued their AQF certification, or transfer to the replacement, in a timely manner (ASQA guidance, read live 25 August 2026).

A second obligation follows from the same fact: under s 7(2)(c) of the same instrument, advertising may refer to a superseded product only while it is on scope and new enrolments are permitted. For an RTO registered by ASQA, new enrolments in this product are not permitted today, so a course page advertising it is not permitted either — and if ASQA approves a later enrolment date, that moves with it.

Sector-wide: the item 14 cut-off, measured across every live scope · the repealed 12-month rule

Product type
Qualification
Training package
PSP04 — Public Sector Training Package
Currency period ends
30 October 2012
Latest release
Release 2 · 7 March 2012 · 2 releases in all
Supersedes
nothing — no earlier product listed
Superseded by
PSP61012 equivalent

Where the register points next

Each step below is one supersession training.gov.au publishes between two products. The label on the rail is the equivalence the register declares for that step — not our reading of it.

  1. PSP61010Superseded — equivalentAdvanced Diploma of Translating
  2. equivalent
  3. PSP61012Superseded — not equivalentAdvanced Diploma of Translating
  4. not equivalent
  5. PSP60816Superseded — not equivalentAdvanced Diploma of Translating
  6. not equivalent
  7. PSP60822CurrentAdvanced Diploma of Translating

What the register says changed

These are the mapping notes training.gov.au attaches to each supersession, quoted as the register writes them. They are the only public record of what actually changed between two versions.

Official documents on the register

What training.gov.au lists for PSP61010 and for its training package PSP04 (release 4.2), with the name and date the register publishes for each file. We link them; we have not read them, and nothing on this page is taken from their contents.

  • PSP61010_R2.docxPSP61010 release 2 · product document · published 26 November 2024
  • PSP61010_R2.pdfPSP61010 release 2 · product document · published 20 July 2012

Is PSP61010 on your scope?

This page is the register's record of one product. What it cannot tell you is whether PSP61010 sits on your own scope today, or what else on that scope has moved without anyone noticing. Enter your RTO number and we read every product on your live scope against training.gov.au and tell you which ones are superseded and which replacements the register flags not equivalent.

Public code, nothing else. We read your live scope from training.gov.au and answer here — we keep neither the code nor the answer; what remains is the two-minute abuse counter described on our privacy page.

Whether a supersession requires anything of you, and what, sits with you and your regulator. This page maps what the register records; it does not make that judgement. If the difference between an equivalent and a non-equivalent replacement is the question, we wrote it up in equivalent vs not equivalent.

What PSP61010 is made of

training.gov.au lists 25 units for PSP61010. It does not mark them core or elective: the unit grid records N/A for every one of them. The register does not publish a completion rule in units for this product, so we do not state one. What it takes to complete the product is in the packaging rules on training.gov.au.

Units listed 25 listed

CodeUnitCore or electiveIn this product
BSBADM506BManage business document design and developmentN/Anot current
BSBDIV301AWork effectively with diversityN/Anot current
BSBITU404AProduce complex desktop published documentsN/Anot current
BSBLEG304AApply the principles of confidentiality and security within the legal environmentN/Anot current
BSBOHS303BContribute to OHS hazard identification and risk assessmentN/Anot current
BSBREL701ADevelop and cultivate collaborative partnerships and relationshipsN/Anot current
BSBRES401AAnalyse and present research informationN/Anot current
BSBSMB401AEstablish legal and risk management requirements of small businessN/Anot current
BSBSMB405AMonitor and manage small business operationsN/Anot current
CHCORG627BProvide mentoring support to colleaguesN/Anot current
CUFWRT301AWrite content for a range of mediaN/Anot current
CUFWRT401AEdit textsN/Anot current
PSPTIS501ANegotiate translating and interpreting assignmentsN/Anot current
PSPTIS502APrepare to translate and interpretN/Anot current
PSPTIS504AMaintain and enhance professional practiceN/Anot current
PSPTIS508AAnalyse texts to be translated (LOTE)N/Anot current
PSPTIS512ADemonstrate written language proficiency in different subjects and cultural contextsN/Anot current
PSPTIS601ATranslate special purpose texts from English to LOTEN/Anot current
PSPTIS602AQuality assure translationsN/Anot current
PSPTIS603AApply codes and standards to professional judgementN/Anot current
PSPTIS604ATranslate multimedia source materialN/Anot current
PSPTIS609APrepare translated transcriptsN/Anot current
PSPTIS611ATranslate special purpose texts from LOTE to EnglishN/Anot current
PSPTIS612AUse translation technologyN/Anot current
PSPTIS614AApply theories to translating and interpreting work practicesN/Anot current

The register publishes this unit grid without a core or elective flag, so this page does not split it into core and elective. "Not current" means training.gov.au no longer recommends that unit for use inside this product — it does not say anything about the product itself.

Source: this product on training.gov.au, Australia's national training register — or go straight to the units it requires. The rule itself is item 14 of F2025L00355, and ASQA publishes the extensions it has granted. Read on 13 October 2026 UTC. Every code, title, date, status and equivalence flag on this page is the register's; nothing here is estimated or inferred, and where the register publishes nothing we say so.

Every PSP training product on the register · Search all training products

Take this with you — one email with this page's clock as the register states it today. Nothing scheduled after it.

No account, no card. Your address gets this one email — no list, no marketing. Cutoff alerts only ever come from a watch you start yourself — the box just records your yes now — and every alert has a one-click stop.

Is PSP61010 still on your scope? Type your RTO code and get the free breakdown — every superseded product on your live scope, and whether the register flags each replacement equivalent.

No account, no card. We never ask for anything about your learners. Your address gets this one report — no list, no marketing — and the scope watch only if you tick the box, with one click to stop it.