Where the register points next
Each step below is one supersession training.gov.au publishes between two products. The label on the rail is the equivalence the register declares for that step — not our reading of it.
What the register says changed
These are the mapping notes training.gov.au attaches to each supersession, quoted as the register writes them. They are the only public record of what actually changed between two versions.
Is MSF40418 on your scope?
This page is the register's record of one product. What it cannot tell you is whether MSF40418 sits on your own scope today, or what else on that scope has moved without anyone noticing. Enter your RTO number and we read every product on your live scope against training.gov.au and tell you which ones are superseded and which replacements the register flags not equivalent.
Whether a supersession requires anything of you, and what, sits with you and your regulator. This page maps what the register records; it does not make that judgement. If the difference between an equivalent and a non-equivalent replacement is the question, we wrote it up in equivalent vs not equivalent.
What MSF40418 is made of
training.gov.au lists 43 units for MSF40418: 2 core and 41 elective. The register does not publish a completion rule in units for this product, so we do not state one. How many of the electives are required is in the packaging rules on training.gov.au.
Core units 2 listed
Elective units 41 listed
| Code | Unit | In this product |
|---|---|---|
| BSBCUS402 | Address customer needs | !not current |
| BSBLDR414 | Lead team effectiveness | ●current |
| BSBOPS403 | Apply business risk management processes | ●current |
| BSBOPS505 | Manage organisational customer service | ●current |
| BSBPMG420 | Apply project scope management techniques | ●current |
| BSBPRO401 | Develop product knowledge | !not current |
| BSBSLS408 | Present, secure and support sales solutions | !not current |
| BSBWRT411 | Write complex documents | ●current |
| CPCCBC4001A | Apply building codes and standards to the construction process for low rise building projects | !not current |
| CPCCBC4004 | Identify and produce estimated costs for building and construction projects | ●current |
| CPCCBC4005 | Produce labour and material schedules for ordering | ●current |
| CPCCBC4012 | Read and interpret plans and specifications | ●current |
| CPCCBC4013 | Prepare and evaluate tender documentation | ●current |
| ICPSUP455 | Supervise and schedule work of others | !not current |
| MEM30031A | Operate computer-aided design (CAD) system to produce basic drawing elements | !not current |
| MSFAH4003 | Advise on security technology, hardware and services | !not current |
| MSFAH4004 | Prepare architectural door hardware schedules | !not current |
| MSFDN4003 | Produce patterns and templates | !not current |
| MSFDN5001 | Generate and transfer complex computer-aided drawings and specifications | !not current |
| MSFFM3009 | Produce manual and computer-aided production drawings | !not current |
| MSFFT4007 | Sample, inspect and test products to specifications | !not current |
| MSFFT4010 | Identify and calculate production costs | !not current |
| MSFFT4011 | Purchase materials and consumables | !not current |
| MSFFT4012 | Prepare a tender submission | !not current |
| MSFGG4009 | Apply standards and codes of practice for the glass industry | !not current |
| MSFGG4010 | Use glass industry data systems | !not current |
| MSFGG4011 | Manage glass industry production scheduling | !not current |
| MSFGG4012 | Perform laser measurement and levelling for glass windows and doors in buildings | !not current |
| MSFGG4014 | Operate complex glass processing plant control systems | !not current |
| MSFGG4015 | Manage glass processing plant shutdown and restart | !not current |
Show the remaining 11 elective units
| Code | Unit | In this product |
|---|---|---|
| MSFGG4016 | Plan and coordinate commercial glazing installations | !not current |
| MSMENV472 | Implement and monitor environmentally sustainable work practices | ●current |
| MSS402031 | Interpret product costs in terms of customer requirements | !not current |
| MSS403021 | Facilitate a Just in Time system | !not current |
| MSS404054 | Apply statistics to operational processes | !not current |
| MSS404084 | Undertake process capability improvements | !not current |
| TAEDEL301 | Provide work skill instruction | !not current |
| TAEDEL402 | Plan, organise and facilitate learning in the workplace | !not current |
| TAEDEL404 | Mentor in the workplace | !not current |
| TLIA0025 | Assess and monitor optimum stock levels | ●current |
| TLIA0031 | Organise transport of freight or goods | ●current |
Core and elective are the register's own flags on the unit grid of the release read here. "Not current" means training.gov.au no longer recommends that unit for use inside this product — it does not say anything about the product itself.
Source: this product on training.gov.au, Australia's national training register — or go straight to the units it requires. The rule itself is item 14 of F2025L00355, and ASQA publishes the extensions it has granted. Read on 28 August 2026 UTC. Every code, title, date, status and equivalence flag on this page is the register's; nothing here is estimated or inferred, and where the register publishes nothing we say so.
Every MSF training product on the register · Search all training products
Is MSF40418 still on your scope? Type your RTO code and get the free breakdown — every superseded product on your live scope, and whether the register flags each replacement equivalent.
No account, no card. We never ask for anything about your learners. Your address gets this one report — no list, no marketing — and the scope watch only if you tick the box, with one click to stop it.