UET50319 Diploma of ESI - Power Systems Operations

Supersededtraining.gov.au: supersededEquivalent

The currency period for UET50319 ended on 18 September 2021 — 4 years ago. It names one replacement below, with the equivalence it declares for each.

Transition clockClosed to new enrolments

New enrolments are not permitted from 20 September 2022 — one year from the date the replacement was included on the National Register (s 14(1)(a)(i) of the National VET Regulator (Compliance Standards for NVR RTOs and Fit and Proper Person Requirements) Instrument 2025 (F2025L00355, in force 1 July 2025)), or from a later date if ASQA has approved otherwise for your organisation.

Learners already enrolled have no fixed deadline: they complete the product and are issued their AQF certification, or transfer to the replacement, in a timely manner (ASQA guidance, read live 25 August 2026).

The same date closes a second obligation: under s 7(2)(c) of the same instrument, advertising may refer to a superseded product only while it is on scope and new enrolments are permitted. When enrolments stop, the course page advertising it stops being permitted too — and if ASQA approves a later enrolment date, that moves with it.

Sector-wide: the item 14 cut-off, measured across every live scope · the repealed 12-month rule

Product type
Qualification
Training package
UET — Transmission, Distribution and Rail Sector
Currency period ends
18 September 2021
Latest release
Release 2 · 20 April 2021 · 2 releases in all
Supersedes
UET50312
Superseded by
UET50321 equivalent

Where the register points next

Each step below is one supersession training.gov.au publishes between two products. The label on the rail is the equivalence the register declares for that step — not our reading of it.

  1. UET50319Superseded — equivalentDiploma of ESI - Power Systems Operations
  2. equivalent
  3. UET50321Deleted from the registerDiploma of ESI - Power Systems Operations

The register does not list a current endpoint for this chain: UET50321 is the last product it points at, and UET50321 is not marked current either.

What the register says changed

These are the mapping notes training.gov.au attaches to each supersession, quoted as the register writes them. They are the only public record of what actually changed between two versions.

  • UET50312UET50319equivalent24 September 2019

    The register records this supersession but attaches no note on what changed.

  • UET50319UET50321equivalent19 September 2021

    The register records this supersession but attaches no note on what changed.

Is UET50319 on your scope?

This page is the register's record of one product. What it cannot tell you is whether UET50319 sits on your own scope today, or what else on that scope has moved without anyone noticing. Enter your RTO number and we read every product on your live scope against training.gov.au and tell you which ones are superseded and which replacements the register flags not equivalent.

Public code, nothing else. We read your live scope from training.gov.au and answer here — nothing is stored unless you ask us to watch it.

Whether a supersession requires anything of you, and what, sits with you and your regulator. This page maps what the register records; it does not make that judgement. If the difference between an equivalent and a non-equivalent replacement is the question, we wrote it up in equivalent vs not equivalent.

What UET50319 is made of

training.gov.au lists 72 units for UET50319: 16 core and 56 elective. The register does not publish a completion rule in units for this product, so we do not state one. How many of the electives are required is in the packaging rules on training.gov.au.

Core units 16 listed

CodeUnitIn this product
UEENEED104AUse engineering applications software on personal computersnot current
UEENEEE101AApply Occupational Health and Safety regulations, codes and practices in the workplacenot current
UEENEEE104ASolve problems in d.c. circuitsnot current
UEENEEE107AUse drawings, diagrams, schedules, standards, codes and specificationsnot current
UEENEEE124ACompile and produce an energy sector detailed reportnot current
UEENEEE125AProvide engineering solutions for problems in complex multiple path circuitsnot current
UEENEEE126AProvide solutions to basic engineering computational problemsnot current
UEENEEG101ASolve problems in electromagnetic devices and related circuitsnot current
UEENEEG102ASolve problems in low voltage a.c. circuitsnot current
UEENEEG149AProvide engineering solutions to problems in complex polyphase power circuitsnot current
UETTDREL11Apply sustainable energy and environmental proceduresnot current
UETTDREL15Respond to power systems technical enquiries and requestsnot current
UETTDREL16Working safely near live electrical apparatusnot current
UETTDRIS62Implement and monitor the power system organisational WHS/OHS policies, procedures and programsnot current
UETTDRIS63Implement & monitor power system environmental & sustainable energy management policies & proceduresnot current
UETTDRSO45Operate and monitor system SCADA equipmentnot current

Elective units 56 listed

CodeUnitIn this product
BSBCUS501Manage quality customer servicenot current
BSBFIM501Manage budgets and financial plansnot current
BSBINM501Manage an information or knowledge management systemnot current
BSBINN502Build and sustain an innovative work environmentnot current
BSBLED501Develop a workplace learning environmentnot current
BSBMGT502Manage people performancenot current
BSBMGT516Facilitate continuous improvementnot current
BSBMGT517Manage operational plannot current
BSBSUS501Develop workplace policy and procedures for sustainabilitynot current
BSBWOR501Manage personal work priorities and professional developmentnot current
BSBWOR502Lead and manage team effectivenessnot current
TLIF2010Apply fatigue management strategiescurrent
TLIF3063Administer the implementation of fatigue management strategiesnot current
UEENEEE102AFabricate, assemble and dismantle utilities industry componentsnot current
UEENEEG006ASolve problems in single and three phase low voltage machinesnot current
UEENEEH102ARepairs basic electronic apparatus faults by replacement of componentsnot current
UEENEEH112ATroubleshoot digital sub-systemsnot current
UEENEEH139ATroubleshoot basic amplifier circuitsnot current
UEENEEI155ADevelop structured programs to control external devicesnot current
UETTDRDS31Draft and layout a power system overhead distribution extensionnot current
UETTDRDS32Draft and layout a power system underground distribution extensionnot current
UETTDRDS33Draft and layout a power system street lighting systemnot current
UETTDRDS34Draft and layout a power system distribution substation minor upgradenot current
UETTDRDS35Design overhead distribution power systemsnot current
UETTDRDS36Design underground distribution power systemsnot current
UETTDRDS37Design power system distribution substationsnot current
UETTDRDS38Design power system public lighting systemsnot current
UETTDRDS39Prepare and manage detailed construction plans for electrical power system infrastructurenot current
UETTDRDS42Investigate quality of power systems supply issuesnot current
UETTDRDS43Develop high voltage and low voltage distribution protection systemsnot current
Show the remaining 26 elective units
CodeUnitIn this product
UETTDRDS45Organise and implement ESI line and easement surveysnot current
UETTDRDS46Develop planned power systems outage strategiesnot current
UETTDRIS67Solve problems in energy supply network equipmentnot current
UETTDRIS68Solve problems in energy supply network protection equipment and systemsnot current
UETTDRIS69Diagnose and rectify faults in energy supply apparatusnot current
UETTDRIS70Diagnose and rectify faults in electrical energy distribution systemsnot current
UETTDRIS71Diagnose and rectify faults in electrical energy supply transmission systemsnot current
UETTDRIS72Diagnose and rectify faults in distributed generation systemsnot current
UETTDRSO36Develop low voltage distribution switching programsnot current
UETTDRSO37Develop high voltage distribution and sub-transmission switching programsnot current
UETTDRSO38Develop and evaluate power systems transmission switching programsnot current
UETTDRSO40Coordinate high voltage distribution and sub-transmission networksnot current
UETTDRSO46Monitor and control the field staff activitiesnot current
UETTDRSO47Coordinate high voltage transmission networknot current
UETTDRSO48Respond to discrete and interdependent protection operationsnot current
UETTDRSO49Coordinate power system operations in a regulated energy marketnot current
UETTDRTS21Maintain interdependent network protection and control systemsnot current
UETTDRTS22Commission interdependent network protection and control systemsnot current
UETTDRTS25Maintain and test and metering schemesnot current
UETTDRTS26Commission power systems metering schemesnot current
UETTDRTS27Perform accuracy checks on power systems instrument transformersnot current
UETTDRTS28Repair, test and calibrate protection relays and metersnot current
UETTDRTS29Develop power systems secondary isolation instructional documentsnot current
UETTDRTS31Maintain, test and commission power systems voltage regulating equipmentnot current
UETTDRTS34Install and maintain power system communication equipmentnot current
UETTDRTS35Maintain complex network protection and control systemsnot current

Core and elective are the register's own flags on the unit grid of the release read here. "Not current" means training.gov.au no longer recommends that unit for use inside this product — it does not say anything about the product itself.

Source: this product on training.gov.au, Australia's national training register — or go straight to the units it requires. The rule itself is item 14 of F2025L00355, and ASQA publishes the extensions it has granted. Read on 28 August 2026 UTC. Every code, title, date, status and equivalence flag on this page is the register's; nothing here is estimated or inferred, and where the register publishes nothing we say so.

Every UET training product on the register · Search all training products

Is UET50319 still on your scope? Type your RTO code and get the free breakdown — every superseded product on your live scope, and whether the register flags each replacement equivalent.

No account, no card. We never ask for anything about your learners. Your address gets this one report — no list, no marketing — and the scope watch only if you tick the box, with one click to stop it.