UET60212 Advanced Diploma of ESI - Power Systems

Supersededtraining.gov.au: supersededEquivalent

The currency period for UET60212 ended on 23 September 2019 — 7 years ago. It names one replacement below, with the equivalence it declares for each.

Transition clockOpen for new enrolmentsClosing to new enrolments soonClosed to new enrolments

For an RTO registered by ASQA, new enrolments are not permitted today, unless ASQA has approved otherwise — for your organisation, for a class of RTOs, or for all RTOs. The one-year point this rule counts from — one year from the date the replacement was included on the National Register — fell earlier, on 25 September 2020. That date is arithmetic, not a day on which this instrument prohibited anything: s 14(1)(a)(i) of the National Vocational Education and Training Regulator (Compliance Standards for NVR Registered Training Organisations and Fit and Proper Person Requirements) Instrument 2025 (F2025L00355) commenced on 1 July 2025 and imposes nothing before then. RTOs registered by VRQA in Victoria or by the TAC in Western Australia are not covered by it.

Learners already enrolled have no fixed deadline: they complete the product and are issued their AQF certification, or transfer to the replacement, in a timely manner (ASQA guidance, read live 25 August 2026).

A second obligation follows from the same fact: under s 7(2)(c) of the same instrument, advertising may refer to a superseded product only while it is on scope and new enrolments are permitted. For an RTO registered by ASQA, new enrolments in this product are not permitted today, so a course page advertising it is not permitted either — and if ASQA approves a later enrolment date, that moves with it.

Sector-wide: the item 14 cut-off, measured across every live scope · the repealed 12-month rule

Product type
Qualification
Training package
UET12 — Transmission, Distribution and Rail Sector Training Package
Currency period ends
23 September 2019
Latest release
Release 2 · 14 March 2013 · 2 releases in all
Supersedes
UET60109
Superseded by
UET60219 equivalent

Where the register points next

Each step below is one supersession training.gov.au publishes between two products. The label on the rail is the equivalence the register declares for that step — not our reading of it.

  1. UET60212Superseded — equivalentAdvanced Diploma of ESI - Power Systems
  2. equivalent
  3. UET60219Superseded — equivalentAdvanced Diploma of ESI - Power Systems
  4. equivalent
  5. UET60221Superseded — not equivalentAdvanced Diploma of ESI - Power Systems
  6. not equivalent
  7. UET60222CurrentAdvanced Diploma of ESI - Power Systems

What the register says changed

These are the mapping notes training.gov.au attaches to each supersession, quoted as the register writes them. They are the only public record of what actually changed between two versions.

  • UET60109UET60212equivalent30 April 2012

    The register records this supersession but attaches no note on what changed.

  • UET60212UET60219equivalent24 September 2019

    The register records this supersession but attaches no note on what changed.

Official documents on the register

What training.gov.au lists for UET60212 and for its training package UET12 (release 2.1), with the name and date the register publishes for each file. We link them; we have not read them, and nothing on this page is taken from their contents.

  • UET60212_R2.pdfUET60212 release 2 · product document · published 17 March 2013
  • UET60212_R2.docxUET60212 release 2 · product document · published 26 November 2024

Is UET60212 on your scope?

This page is the register's record of one product. What it cannot tell you is whether UET60212 sits on your own scope today, or what else on that scope has moved without anyone noticing. Enter your RTO number and we read every product on your live scope against training.gov.au and tell you which ones are superseded and which replacements the register flags not equivalent.

Public code, nothing else. We read your live scope from training.gov.au and answer here — we keep neither the code nor the answer; what remains is the two-minute abuse counter described on our privacy page.

Whether a supersession requires anything of you, and what, sits with you and your regulator. This page maps what the register records; it does not make that judgement. If the difference between an equivalent and a non-equivalent replacement is the question, we wrote it up in equivalent vs not equivalent.

What UET60212 is made of

training.gov.au lists 107 units for UET60212: 23 core and 84 elective. The register does not publish a completion rule in units for this product, so we do not state one. How many of the electives are required is in the packaging rules on training.gov.au.

Core units 23 listed

CodeUnitIn this product
UEENEED104AUse engineering applications software on personal computersnot current
UEENEEE083AEstablish and follow a competency development plan in an electrotechnology engineering disciplinenot current
UEENEEE101AApply Occupational Health and Safety regulations, codes and practices in the workplacenot current
UEENEEE102AFabricate, assemble and dismantle utilities industry componentsnot current
UEENEEE104ASolve problems in d.c. circuitsnot current
UEENEEE107AUse drawings, diagrams, schedules, standards, codes and specificationsnot current
UEENEEE124ACompile and produce an energy sector detailed reportnot current
UEENEEE125AProvide engineering solutions for problems in complex multiple path circuitsnot current
UEENEEE126AProvide solutions to basic engineering computational problemsnot current
UEENEEG101ASolve problems in electromagnetic devices and related circuitsnot current
UEENEEG102ASolve problems in low voltage a.c. circuitsnot current
UEENEEG149AProvide engineering solutions to problems in complex polyphase power circuitsnot current
UETTDREL11AApply sustainable energy and environmental proceduresnot current
UETTDREL16AWorking safely near live electrical apparatusnot current
UETTDRIS62AImplement and monitor the power system organisational OHS policies, procedures and programsnot current
UETTDRIS63AImplement and monitor the power system environmental and sustainable energy management policies and proceduresnot current
UETTDRTS23AConduct evaluation of power system substation faultsnot current
UETTDRTS24ADesign testing and commissioning procedures for field devices and substationsnot current
UETTDRTS30ADesign power systems secondary isolation instructional documentsnot current
UETTDRTS32AConduct evaluation of power systems primary plantnot current
UETTDRTS33AUndertake power systems project management of substation augmentation and maintenancenot current
UETTDRTS35AMaintain complex network protection and control systemsnot current
UETTDRTS36ACommission complex network protection and control systemsnot current

Elective units 84 listed

CodeUnitIn this product
BSBCUS501CManage quality customer servicenot current
BSBFIM501AManage budgets and financial plansnot current
BSBINM501AManage an information or knowledge management systemnot current
BSBINN502ABuild and sustain an innovative work environmentnot current
BSBLED501ADevelop a workplace learning environmentnot current
BSBMGT502BManage people performancenot current
BSBMGT515AManage operational plannot current
BSBMGT516CFacilitate continuous improvementnot current
BSBSUS501ADevelop workplace policy and procedures for sustainabilitynot current
BSBWOR501BManage personal work priorities and professional developmentnot current
BSBWOR502BEnsure team effectivenessnot current
UEENEED117AInstall and configure network systems for internetworkingnot current
UEENEEG006ASolve problems in single and three phase low voltage machinesnot current
UEENEEH102ARepairs basic electronic apparatus faults by replacement of componentsnot current
UEENEEH112ATroubleshoot digital sub-systemsnot current
UEENEEH139ATroubleshoot basic amplifier circuitsnot current
UEENEEI155ADevelop structured programs to control external devicesnot current
UEENEEI156ADevelop and test code for microcontroller devicesnot current
UETTDRDS31ADraft and layout a power system overhead distribution extensionnot current
UETTDRDS32ADraft and layout a power system underground distribution extensionnot current
UETTDRDS33ADraft and layout a power system street lighting systemnot current
UETTDRDS34ADraft and layout a power system distribution substation minor upgradenot current
UETTDRDS35ADesign overhead distribution power systemsnot current
UETTDRDS36ADesign underground distribution power systemsnot current
UETTDRDS37ADesign power system distribution substationsnot current
UETTDRDS38ADesign power system public lighting systemsnot current
UETTDRDS39APrepare and manage detailed construction plans for electrical power system infrastructurenot current
UETTDRDS40APrepare and appraise power systems financial impact statementsnot current
UETTDRDS41AManage electrical power systems infrastructure projectsnot current
UETTDRDS42AInvestigate quality of power systems supply issuesnot current
Show the remaining 54 elective units
CodeUnitIn this product
UETTDRDS43ADevelop high voltage and low voltage distribution protection systemsnot current
UETTDRDS44ADesign power system substations modificationsnot current
UETTDRDS45AOrganise and implement ESI line and easement surveysnot current
UETTDRDS46ADevelop planned power systems outage strategiesnot current
UETTDRDS47AReview power system asset management strategiesnot current
UETTDRDS48AAnalyse and appraise power system fault and outage datanot current
UETTDRDS49AEstablish and manage power system geographical information systems datanot current
UETTDRDS50ADesign customer power system substationsnot current
UETTDRDS51AManage power system transmission and sub-transmission design processnot current
UETTDRDS52ADesign power system transmission, sub-transmission and zone substation buildingsnot current
UETTDRDS53ADesign power system transmission and sub-transmission substation primary plantnot current
UETTDRDS54ADesign power system transmission and sub-transmission protection and controlnot current
UETTDRDS55ADesign power system transmission and sub-transmission substation earthingnot current
UETTDRDS56ADesign power system transmission, sub-transmission and zone substation civil and structural componentsnot current
UETTDRDS57ADesign power system overhead transmission systemsnot current
UETTDRDS58ADesign underground transmission systemsnot current
UETTDREL15ARespond to power systems technical enquiries and requestsnot current
UETTDRIS66AManage an electricity power system OHS management systemnot current
UETTDRIS67ASolve problems in energy supply network equipmentnot current
UETTDRIS68ASolve problems in energy supply network protection equipment and systemsnot current
UETTDRIS69ADiagnose and rectify faults in energy supply apparatusnot current
UETTDRIS70ADiagnose and rectify faults in electrical energy distribution systemsnot current
UETTDRIS71ADiagnose and rectify faults in electrical energy supply transmission systemsnot current
UETTDRIS72ADiagnose and rectify faults in distributed generation systemsnot current
UETTDRIS73ADevelop engineering solutions for energy supply power transformer problemsnot current
UETTDRSO32AManage power systems network faultsnot current
UETTDRSO33AManage power systems critical eventsnot current
UETTDRSO34AControl power systems generating plantnot current
UETTDRSO35AManage high voltage distribution and subtransmission network demandnot current
UETTDRSO36ADevelop low voltage distribution switching programsnot current
UETTDRSO37ADevelop high voltage distribution and subtransmission switching programsnot current
UETTDRSO38ADevelop and evaluate power systems transmission switching programsnot current
UETTDRSO39ACoordinate low voltage distribution networksnot current
UETTDRSO40ACoordinate high voltage distribution and subtransmission networksnot current
UETTDRSO41AManage power systems transmission networksnot current
UETTDRSO42AManage power systems transmission network demandnot current
UETTDRSO43ACoordinate low voltage distribution network demandnot current
UETTDRSO44ADevelop crisis power systems management plansnot current
UETTDRSO45AOperate and monitor system SCADA equipmentnot current
UETTDRSO46AMonitor and control the field staff activitiesnot current
UETTDRSO47ACoordinate high voltage transmission networknot current
UETTDRSO48ARespond to discrete and interdependent protection operationsnot current
UETTDRSO49ACoordinate power system operations in a regulated energy marketnot current
UETTDRSO50ARespond to complex power system protection operationsnot current
UETTDRSO51AManage network systems power flowsnot current
UETTDRTS21AMaintain interdependent network protection and control systemsnot current
UETTDRTS22ACommission interdependent network protection and control systemsnot current
UETTDRTS25AMaintain and test and metering schemesnot current
UETTDRTS26ACommission power systems metering schemesnot current
UETTDRTS27APerform accuracy checks on power systems instrument transformersnot current
UETTDRTS28ARepair, test and calibrate protection relays and metersnot current
UETTDRTS29ADevelop power systems secondary isolation instructional documentsnot current
UETTDRTS31AMaintain, test and commission power systems voltage regulating equipmentnot current
UETTDRTS34AInstall and maintain power system communication equipmentnot current

Core and elective are the register's own flags on the unit grid of the release read here. "Not current" means training.gov.au no longer recommends that unit for use inside this product — it does not say anything about the product itself.

Source: this product on training.gov.au, Australia's national training register — or go straight to the units it requires. The rule itself is item 14 of F2025L00355, and ASQA publishes the extensions it has granted. Read on 14 October 2026 UTC. Every code, title, date, status and equivalence flag on this page is the register's; nothing here is estimated or inferred, and where the register publishes nothing we say so.

Every UET training product on the register · Search all training products

Take this with you — one email with this page's clock as the register states it today. Nothing scheduled after it.

No account, no card. Your address gets this one email — no list, no marketing. Cutoff alerts only ever come from a watch you start yourself — the box just records your yes now — and every alert has a one-click stop.

Is UET60212 still on your scope? Type your RTO code and get the free breakdown — every superseded product on your live scope, and whether the register flags each replacement equivalent.

No account, no card. We never ask for anything about your learners. Your address gets this one report — no list, no marketing — and the scope watch only if you tick the box, with one click to stop it.